We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Ring Method.
ipros is IPROS GMS ・ IPROS One of the largest technical database sites in Japan that collects information on.

Ring Method - List of Manufacturers, Suppliers, Companies and Products | IPROS GMS

Ring Method Product List

1~1 item / All 1 items

Displayed results

Construction method "Hybrid Fore-Piling"

Enhance blade stability with a combined pattern of "long-length fore piling" and "long-length mirror reinforcement work."

"Hybrid Fore-Piling" is a construction method that is expected to have a higher effect in suppressing the plasticization of surrounding ground. By placing small-diameter steel pipes from the upper part of the mirror section towards the top, it is possible to reinforce not only the "top part" that is reinforced by conventional fore-piling but also the "upper mirror ground" which has a high risk of collapse. [Features] - By increasing the overlap section, it can reinforce the surrounding ground over a wide area, including the mirror section. - Compared to conventional fore-piling, it has a higher effect in suppressing the plasticization of the ground. - By using small-diameter steel pipes (φ76.3), it is more economical than conventional methods. *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Ring Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration